Summary
PLANS for the redevelopment of a town hall have been downsized after the group behind the scheme lost crucial funding.
The Witham Hall, in Barnard Castle, was to undergo a [pounds]6m overhaul, but the project was put in doubt following the withdrawal of [pounds]2m funding from One North East.See the full content of this document
Extract
Lesser Deal for Hall Upgrade to Cost [Pounds]2m
However a new, smaller scheme has been given a substantial boost in the form of a promise of [pounds...
See the full content of this document
Sponsored links
